You are here: Home / Wind Farms

Wind Farms

This page provides links to the wind farm development projects using Windflow 500 wind turbines and a link to a wind resource assessment service offered by Windflow for potential new wind farm sites.

Gebbies PassWindflow wind turbines at Te Rere Hau wind farm

The first Windflow 500 (the company's prototype machine), was installed at Gebbies Pass in 2003.

Te Rere Hau

Windflow supplied 97 Windflow 500 wind turbines to the 48.5 MW wind farm Te Rere Hau, developed by NZ Windfarms Ltd.

The 97 turbines were installed between 2006 and 2011.

Long Gully

This is a consented small (up to 12.5 MW) local wind farm in Long Gully near Wellington that Windflow developed for Mighty River Power.

Mt Cass

MainPower's Mt Cass wind farm in North Canterbury was consented in December 2011 with an envelope including three options, including up to 67 Windflow 500 turbines.

Prospective Wind Farms

If you think you have a site available for a wind farm, have a look at our wind resource assessment service.

windflow wind turbine factory rotor

 

Windflow Technology Ltd

Physical:
44 Mandeville Street
Riccarton, Christchurch 8011

Postal:
PO Box 42-125
Christchurch 8149

NEW ZEALAND

Phone: +64 3 365 8960
Fax: +64 3 365 1402

Email us